[{"data":1,"prerenderedAt":207},["ShallowReactive",2],{"service-telecommunication":3,"service-content-telecommunication":17},{"id":4,"menu_type_id":4,"parent_id":5,"is_child":6,"menu_title":7,"page_title":7,"icon":8,"slug":9,"link":8,"content":8,"page_banner":10,"menu_order":11,"meta_tag":7,"meta_title":7,"meta_description":7,"status":12,"publish_date":13,"expire_date":13,"created_at":14,"created_by":11,"updated_at":15,"updated_by":16},"3","2","1","Telecommunication","","telecommunication","622488_210290.jpg","0","Live",null,"2021-05-28 18:46:28","2022-02-22 09:51:26","4)",{"title":7,"tagline":18,"description":19,"stats":20,"features":30,"scopeItems":43,"items":53,"flagship":120,"processSteps":133,"standards":162,"processTitle":181,"processSubtitle":182,"standardsTitle":183,"standardsIntro":184,"faq":185},"Network Rollout · RF Optimization · Testing","Complete telecom network solutions - BTS, microwave, optical mux, antenna systems, tower infrastructure and result clearing for operators nationwide.",[21,24,27],{"value":22,"label":23},"100+","Sites Active",{"value":25,"label":26},"64","Districts Covered",{"value":28,"label":29},"24\u002F7","Support",[31,33,35,37,39,41],{"text":32},"Operator-graded quality - equipment and workmanship meeting TDRA and BSC standards.",{"text":34},"Specialist teams - BTS, microwave, RF, and tower erection specialists.",{"text":36},"Nationwide coverage - field teams deployed across all 64 districts of Bangladesh.",{"text":38},"Full lifecycle - from route survey through testing, commissioning and AMC.",{"text":40},"Field-tested tooling - TEMS 8–15, ZAP Grab, GPS\u002FSCFT drive test platforms for live network validation.",{"text":42},"Complete field kit - Sony Ericsson test handsets, TEMS dongles, GPS units, data cables, inverters, antennas and SIM cards on every crew.",[44,45,46,47,48,49,50,51,52],"BTS Installation","Microwave Links","Optical Mux","Telecom Tower","Antenna Systems","Result Clearing","RF Optimization","Solar Power Systems","O&M Support",[54,62,69,75,82,90,97,105,112],{"name":44,"description":55,"color":56,"icon":57,"subItems":58},"Indoor, outdoor, micro cell, PICO, FEMTO and ATOM site deployment with complete commissioning.","brand","\u003Ccircle cx='12' cy='12' r='2'\u002F\u002F>\u003Cpath d='M16.24 7.76a6 6 0 0 1 0 8.49m-8.48-.01a6 6 0 0 1 0-8.49m11.31-2.82a10 10 0 0 1 0 14.14m-14.14 0a10 10 0 0 1 0-14.14'\u002F\u002F>",[59,60,61],"IBS, Micro cell, Repeater, PICO, FEMTO, ATOM","Site acquisition and preparation","Power and grounding systems",{"name":45,"description":63,"color":56,"icon":64,"subItems":65},"Point-to-point and point-to-multipoint microwave transmission systems for backhaul and core network.","\u003Ccircle cx='18' cy='5' r='3'\u002F\u002F>\u003Ccircle cx='6' cy='12' r='3'\u002F\u002F>\u003Ccircle cx='18' cy='19' r='3'\u002F\u002F>\u003Cline x1='8.59' y1='13.51' x2='15.42' y2='17.49'\u002F\u002F>\u003Cline x1='15.41' y1='6.51' x2='8.59' y2='10.49'\u002F\u002F>",[66,67,68],"E-band \u002F SHF microwave","Link budget analysis","Line of sight survey",{"name":46,"description":70,"color":56,"icon":64,"subItems":71},"SDH\u002FDWDM optical multiplex installation, testing and commissioning for high-capacity transmission.",[72,73,74],"SDH\u002FSONET networks","DWDM deployments","OTDR testing",{"name":47,"description":76,"color":56,"icon":77,"subItems":78},"Tower erection, transmission line installation and commissioning for telecom and power applications.","\u003Cpath d='M12 3v18'\u002F\u002F>\u003Cpath d='M7 21l5-18 5 18'\u002F\u002F>\u003Cpath d='M8.5 14h7'\u002F\u002F>\u003Cpath d='M9.6 9h4.8'\u002F\u002F>",[79,80,81],"Self-support \u002F lattice towers","Guyed mast erection","Foundation & steel fabrication",{"name":83,"description":84,"color":56,"icon":85,"subItems":86},"Rectifier & Battery","Rectifiers, inverters, isolation transformers, battery banks and power management for telecom sites.","\u003Crect x='1' y='6' width='18' height='12' rx='2'\u002F\u002F>\u003Cline x1='23' y1='10' x2='23' y2='14'\u002F\u002F>",[87,88,89],"-48V DC power plants","Battery sizing & testing","Solar hybrid power",{"name":49,"description":91,"color":56,"icon":92,"subItems":93},"Radio path and line testing, frequency clearance, and TDRA licensing support.","\u003Cpath d='M22 11.08V12a10 10 0 1 1-5.93-9.14'\u002F\u002F>\u003Cpolyline points='22 4 12 14.01 9 11.01'\u002F\u002F>",[94,95,96],"Radio path analysis","TDRA licensing","Signal quality reports",{"name":50,"description":98,"color":56,"icon":99,"subItems":100},"Indoor and outdoor BTS RF optimization, GSM antenna parameter tuning, height and model change, MW link dismantling and extension cabinet installation for maximum network performance.","\u003Cpath d='M12 2a3 3 0 0 0-3 3v10a3 3 0 0 0 6 0V5a3 3 0 0 0-3-3z'\u002F\u002F>\u003Cpath d='M15 6h3'\u002F\u002F>\u003Cpath d='M18 9h4'\u002F\u002F>\u003Cpath d='M3 6h3'\u002F\u002F>\u003Cpath d='M6 9h4'\u002F\u002F>\u003Cpolyline points='9 14 9 22'\u002F\u002F>\u003Cpolyline points='15 14 15 22'\u002F\u002F>\u003Cline x1='6' y1='22' x2='18' y2='22'\u002F\u002F>",[101,102,103,104],"Indoor & outdoor BTS optimization","GSM antenna parameter, height & model change","MW link dismantling & re-positioning","Extension cabinet installation",{"name":51,"description":106,"color":56,"icon":107,"subItems":108},"Solar system installation for telecom sites - rooftop, hybrid and standalone solar plants with monitoring and green energy compliance.","\u003Ccircle cx='12' cy='12' r='4.5'\u002F\u002F>\u003Cline x1='12' y1='1.5' x2='12' y2='4'\u002F\u002F>\u003Cline x1='12' y1='20' x2='12' y2='22.5'\u002F\u002F>\u003Cline x1='4.2' y1='4.2' x2='6' y2='6'\u002F\u002F>\u003Cline x1='18' y1='18' x2='19.8' y2='19.8'\u002F\u002F>\u003Cline x1='1.5' y1='12' x2='4' y2='12'\u002F\u002F>\u003Cline x1='20' y1='12' x2='22.5' y2='12'\u002F\u002F>\u003Cline x1='4.2' y1='19.8' x2='6' y2='18'\u002F\u002F>\u003Cline x1='18' y1='6' x2='19.8' y2='4.2'\u002F\u002F>",[109,110,111],"Rooftop & hybrid solar plants","Site-specific load sizing","Performance monitoring & O&M",{"name":113,"description":114,"color":56,"icon":115,"subItems":116},"Operation & Maintenance Support","O & M services for existing deployed telecom networks. ICS Technology Ltd has a large team with vast experience in telecom operators - network troubleshooting, critical fault resolution for Transmission, Radio network and telecom Power arena.","\u003Cpolyline points='22 12 18 12 15 21 9 3 6 12 2 12'\u002F\u002F>\u003Cline x1='12' y1='22' x2='12' y2='12'\u002F\u002F>\u003Cline x1='12' y1='12' x2='12' y2='4'\u002F\u002F>",[117,118,119],"24\u002F7 NOC monitoring & dispatch","Radio & Transmission fault resolution","Telecom Power arena support",{"title":121,"description":122,"stats":123,"link":132},"National Grid Telecom Rollout","Large-scale BTS and microwave network rollout across Bangladesh covering urban and rural areas, enabling seamless connectivity for millions of subscribers.",[124,125,127,130],{"value":22,"label":23},{"value":25,"label":126},"Districts",{"value":128,"label":129},"99.9%","Uptime",{"value":28,"label":131},"Monitoring","\u002F#projects",[134,138,142,146,150,154,158],{"step":135,"title":136,"description":137},"01","Site Survey","Location feasibility, structural assessment and power availability.",{"step":139,"title":140,"description":141},"02","RF & Network Survey","GPS-based site selection, transmission route planning, GSM\u002FWCDMA drive tests, benchmarking, IB drive, walk test and SCFT data collection.",{"step":143,"title":144,"description":145},"03","Design & Planning","RF planning, BOM, drawings and regulatory approvals.",{"step":147,"title":148,"description":149},"04","Supply","OEM equipment with customs clearance and logistics.",{"step":151,"title":152,"description":153},"05","Installation","BTS, antennas, microwave, cabling and grounding.",{"step":155,"title":156,"description":157},"06","Testing & T&C","RF testing, throughput tests and acceptance sign-off.",{"step":159,"title":160,"description":161},"07","Monitoring & AMC","NOC monitoring, preventive maintenance and rapid response.",[163,167,172,177],{"title":164,"description":165,"color":56,"icon":166},"TDRA Compliance","All installations meet Telecommunication Directorate regulatory requirements.","\u003Cpath d='M12 22s8-4 8-10V5l-8-3-8 3v7c0 6 8 10 8 10z'\u002F\u002F>",{"title":168,"description":169,"color":170,"icon":171},"ETSI Standards","Equipment and installation aligned with European telecommunications standards.","cyan","\u003Cpath d='M14 2H6a2 2 0 0 0-2 2v16a2 2 0 0 0 2 2h12a2 2 0 0 0 2-2V8z'\u002F\u002F>\u003Cpolyline points='14 2 14 8 20 8'\u002F\u002F>\u003Cline x1='16' y1='13' x2='8' y2='13'\u002F\u002F>\u003Cline x1='16' y1='17' x2='8' y2='17'\u002F\u002F>",{"title":173,"description":174,"color":175,"icon":176},"Site Safety","PPE protocols, climbing certification and safety audits on every site.","amber","\u003Ccircle cx='12' cy='8' r='6'\u002F\u002F>\u003Cpath d='M15.477 12.89 17 22l-5-3-5 3 1.523-9.11'\u002F\u002F>",{"title":178,"description":179,"color":180,"icon":92},"Quality Assurance","Multi-stage inspection, acceptance tests and comprehensive documentation.","emerald","Our deployment process","From site survey through commissioning - a proven methodology for telecom network rollout.","Built to operate at scale.","Every telecom project meets international standards for RF performance, structural integrity and operational reliability - ensuring maximum uptime for your network.",[186,189,192,195,198,201,204],{"question":187,"answer":188},"Do you handle the full telecom rollout lifecycle?","Yes - from initial site survey, RF design and regulatory approvals, through equipment supply, installation, testing & commissioning, and ongoing O&M support.",{"question":190,"answer":191},"What types of BTS sites do you support?","We support all types: Indoor BTS (IBS), Micro cells, PICO, FEMTO, ATOM, and outdoor shelters - with full power, grounding and antenna systems.",{"question":193,"answer":194},"Do you offer microwave transmission solutions?","Yes - we design and deploy point-to-point and point-to-multipoint E-band and SHF microwave links for backhaul and core network applications.",{"question":196,"answer":197},"What is your response time for site emergencies?","We provide 24\u002F7 NOC monitoring with emergency dispatch teams. Critical sites typically see response within 2-4 hours depending on location.",{"question":199,"answer":200},"Do you assist with TDRA licensing and frequency clearance?","Yes, we handle TDRA licensing, radio frequency clearance, spectrum application and compliance documentation for all project types.",{"question":202,"answer":203},"What RF optimization services do you provide?","We cover all RF optimization: indoor and outdoor BTS optimization, GSM antenna parameter tuning, height and model change, MW link dismantling and re-positioning, and extension cabinet installation.",{"question":205,"answer":206},"Do you offer O&M support for existing networks?","Yes - ICS Technology Ltd offers comprehensive O & M services for existing deployed telecom networks, with large experienced teams for troubleshooting Transmission, Radio network and telecom Power issues.",1791319819751]