[{"data":1,"prerenderedAt":127,"buildId":128},["ShallowReactive",2],{"service-civil-works":3,"service-content-civil-works":17},{"id":4,"menu_type_id":5,"parent_id":6,"is_child":7,"menu_title":8,"page_title":8,"icon":9,"slug":10,"link":9,"content":9,"page_banner":11,"menu_order":12,"meta_tag":8,"meta_title":8,"meta_description":13,"status":14,"publish_date":11,"expire_date":11,"created_at":15,"created_by":16,"updated_at":15,"updated_by":16},"41","3","2","1","Civil Works","","civil-works",null,"7","Civil Engineering & Infrastructure Works","Live","2026-11-28 10:00:00","0",{"title":8,"tagline":18,"description":19,"stats":20,"features":21,"scopeItems":30,"items":38,"flagship":82,"processSteps":90,"standards":107,"processSubtitle":124,"standardsTitle":125,"standardsIntro":126},"Foundation · Structure · Transmission Line","ICSTECH executes civil works for power and telecom infrastructure — pile foundations, RCC structures and 400kV transmission line works delivered on Bangladesh's flagship projects.",[],[22,24,26,28],{"text":23},"\u003Cstrong>Nuclear-project pedigree\u003C\u002Fstrong> — 400kV transmission line civil works on the Rooppur Nuclear Power Plant project, delivered through Larsen & Toubro.",{"text":25},"\u003Cstrong>Deep foundation capability\u003C\u002Fstrong> — pile foundation and pile cap construction for transmission towers and heavy structures.",{"text":27},"\u003Cstrong>Infrastructure-aligned crews\u003C\u002Fstrong> — excavation, RCC and structural teams experienced in power-line corridors.",{"text":29},"\u003Cstrong>Single-point delivery\u003C\u002Fstrong> — from earthworks to equipment foundations under one contract.",[31,32,33,34,35,36,37],"Pile Foundation","Pile Cap","Tower Foundation","RCC Works","Earthworks","Cable Trench & Duct","Site Development",[39,44,48,53,58,63,66,70,75,79],{"name":40,"description":41,"color":42,"icon":43},"Pile Foundation Works","Bored and driven pile foundations for transmission towers and heavy structures — rig operation, casing, reinforcement and concrete placement to specification.","indigo","\u003Cline x1='12' y1='2' x2='12' y2='22'\u002F\u002F>\u003Cline x1='4' y1='8' x2='20' y2='8'\u002F\u002F>\u003Cline x1='7' y1='14' x2='17' y2='14'\u002F\u002F>\u003Cline x1='9' y1='20' x2='15' y2='20'\u002F\u002F>",{"name":45,"description":46,"color":42,"icon":47},"Pile Cap Construction","Pile cap construction with full rebar fixing, formwork and controlled concrete pours — transfer-grade accuracy for tower loads.","\u003Crect x='3' y='10' width='18' height='6' rx='1'\u002F\u002F>\u003Cline x1='7' y1='4' x2='7' y2='10'\u002F\u002F>\u003Cline x1='12' y1='4' x2='12' y2='10'\u002F\u002F>\u003Cline x1='17' y1='4' x2='17' y2='10'\u002F\u002F>",{"name":49,"description":50,"color":51,"icon":52},"Transmission Tower Foundation","Foundations for lattice and self-supporting transmission towers — setting templates, anchor bolts and grouting to line tolerances.","brand","\u003Cpolygon points='12 2 4 22 8 22 12 9 16 22 20 22 12 2'\u002F\u002F>\u003Cline x1='7' y1='15' x2='17' y2='15'\u002F\u002F>\u003Cline x1='9' y1='10' x2='15' y2='10'\u002F\u002F>",{"name":54,"description":55,"color":56,"icon":57},"400kV Power Transmission Line Civil Works","Complete civil packages along 400kV line corridors — foundations, access, drainage and associated works executed to contractor QA plans.","amber","\u003Cpolygon points='13 2 3 14 12 14 11 22 21 10 12 10 13 2'\u002F\u002F>",{"name":59,"description":60,"color":61,"icon":62},"Excavation & Earthworks","Mass and structural excavation, backfill with compaction control, and corridor earthworks with survey verification.","emerald","\u003Cpath d='M2 20h20'\u002F\u002F>\u003Cpath d='M4 20V10l4-4h8l4 4v10'\u002F\u002F>\u003Cpath d='M9 20v-6h6v6'\u002F\u002F>",{"name":34,"description":64,"color":42,"icon":65},"Reinforced cement concrete works — footings, plinths, retaining structures and slabs with testing at every pour.","\u003Crect x='3' y='3' width='18' height='18' rx='1'\u002F\u002F>\u003Cline x1='3' y1='9' x2='21' y2='9'\u002F\u002F>\u003Cline x1='3' y1='15' x2='21' y2='15'\u002F\u002F>\u003Cline x1='9' y1='3' x2='9' y2='21'\u002F\u002F>\u003Cline x1='15' y1='3' x2='15' y2='21'\u002F\u002F>",{"name":67,"description":68,"color":51,"icon":69},"Foundation & Structural Construction","Isolated, combined and raft foundations plus structural frames for equipment buildings and sites.","\u003Cpath d='M2 20h20'\u002F\u002F>\u003Cpath d='M5 20V8l7-5 7 5v12'\u002F\u002F>\u003Cpath d='M9 20v-8h6v8'\u002F\u002F>",{"name":71,"description":72,"color":73,"icon":74},"Cable Trench & Duct Construction","Power and telecom cable trenches, duct banks and manholes — graded bedding, duct laying and reinstatement.","cyan","\u003Crect x='2' y='12' width='20' height='8' rx='1'\u002F\u002F>\u003Ccircle cx='7' cy='16' r='1.5'\u002F\u002F>\u003Ccircle cx='12' cy='16' r='1.5'\u002F\u002F>\u003Ccircle cx='17' cy='16' r='1.5'\u002F\u002F>",{"name":76,"description":77,"color":56,"icon":78},"Equipment Foundation & Installation Support","Foundations and plinths for generators, transformers, cabinets and masts — embedded hardware placed to drawing.","\u003Crect x='4' y='14' width='16' height='6' rx='1'\u002F\u002F>\u003Cline x1='8' y1='14' x2='8' y2='8'\u002F\u002F>\u003Cline x1='16' y1='14' x2='16' y2='8'\u002F\u002F>\u003Crect x='6' y='4' width='12' height='4' rx='1'\u002F\u002F>",{"name":37,"description":80,"color":61,"icon":81},"Site clearance, levelling, access roads, fencing bases and drainage for operational readiness.","\u003Cpath d='M3 21h18'\u002F\u002F>\u003Cpath d='M5 21V7l7-4 7 4v14'\u002F\u002F>\u003Cline x1='9' y1='21' x2='9' y2='12'\u002F\u002F>\u003Cline x1='15' y1='21' x2='15' y2='12'\u002F\u002F>",{"title":83,"description":84,"img":85,"stats":86},"400kV Transmission Line — Rooppur Nuclear Power Plant (via Larsen & Toubro)","ICSTECH executed pile foundation and pile cap civil works — with associated construction — for the 400kV transmission line of the Rooppur Nuclear Power Plant project, delivered through principal contractor Larsen & Toubro (L&T) in the Faridpur Zone. Tower-by-tower deep foundations on a nuclear-program schedule demanded exacting survey control, QA documentation and safety discipline.","\u002Fimages\u002Fproducts\u002Fehv-transmission-towers-500x500.jpg",[87,88,89],"400kV transmission line corridor, Faridpur Zone","Pile foundation & pile cap packages","Executed via Larsen & Toubro (L&T)",[91,95,99,103],{"step":92,"title":93,"description":94},"01","Survey & Setting Out","Chainage, tower spotting and survey control tied to the line design.",{"step":96,"title":97,"description":98},"02","Earthworks & Excavation","Access, clearance and excavation with compaction control.",{"step":100,"title":101,"description":102},"03","Foundation Execution","Piling, reinforcement, formwork and pours with cube testing.",{"step":104,"title":105,"description":106},"04","QA & Handover","As-built survey, test records and contractor sign-off per package.",[108,112,116,120],{"title":109,"description":110,"color":51,"icon":111},"Documented QA","Inspection and sign-off at every hold point — no pour without approval.","\u003Cpath d='M22 11.08V12a10 10 0 1 1-5.93-9.14'\u002F\u002F>\u003Cpolyline points='22 4 12 14.01 9 11.01'\u002F\u002F>",{"title":113,"description":114,"color":56,"icon":115},"HSES Regime","Induction-to-lifecycle safety culture targeting zero lost-time incidents.","\u003Ccircle cx='12' cy='8' r='6'\u002F\u002F>\u003Cpath d='M15.477 12.89 17 22l-5-3-5 3 1.523-9.11'\u002F\u002F>",{"title":117,"description":118,"color":73,"icon":119},"Survey Control","Independent survey checks on setting-out, levels and tower geometry.","\u003Ccircle cx='12' cy='12' r='10'\u002F\u002F>\u003Cline x1='2' y1='12' x2='22' y2='12'\u002F\u002F>\u003Cpath d='M12 2a15.3 15.3 0 0 1 4 10 15.3 15.3 0 0 1-4 10 15.3 15.3 0 0 1-4-10 15.3 15.3 0 0 1 4-10z'\u002F\u002F>",{"title":121,"description":122,"color":61,"icon":123},"Material Traceability","Certified steel and concrete with batch records traceable to location.","\u003Cpath d='M14 2H6a2 2 0 0 0-2 2v16a2 2 0 0 0 2 2h12a2 2 0 0 0 2-2V8z'\u002F\u002F>\u003Cpolyline points='14 2 14 8 20 8'\u002F\u002F>\u003Cline x1='16' y1='13' x2='8' y2='13'\u002F\u002F>\u003Cline x1='16' y1='17' x2='8' y2='17'\u002F\u002F>","Foundation-first discipline — every structure stands on verified ground.","Built to nuclear-program discipline.","Works delivered under principal-contractor QA and HSES regimes — documentation, inspection and safety on every activity.",1795898255789,"90c158cf-4bda-4cb1-bb7e-13c8de957849"]